When the well is bored in river-like areas, cement rings are arranged in it to prevent sand from falling in it and filling it up. This is done to ensure that water can be drawn out properly.
How the idea of arranging to the water in the good is reduced in shetraji river bank my orchard from is situated when well is filled up fast this gave rise to does not get filled up and water is available.
In summer, water is made available by this method and this practice is done since 4-5 years about ten to12 feet only, in this two or three rings are arranged, first well is bored very bord and then the side portion is arranged suitably then stones and pobbles level the side portion.
Diameter/ of circumference as per normal well means about5.5 ft2, converted into the ring, which will normally be of the well-measurement.
Expenditure:- to make the well, the approx cost will be Rs:2500 to3000/-.
Use:- All farmers who have farms in shetruji river bank use this well. After digging the well, cement rings have to be arranged properly. |